Shipping time to uk
-
- New
- Posts: 7
- Joined: Fri Feb 07, 2020 5:26 pm
- Drives: Tiguan
- Location: Uk
Shipping time to uk
Hi my son ordered a polo gti+ back in November ,this week it was built ,can anyone give me a rough idea on how long it takes to arrive in the uk
-
- Silver Member
- Posts: 276
- Joined: Mon Jun 25, 2018 10:56 am
- Drives: Polo SEL 1.0 TSI 115PS
- Location: North Yorkshire
Re: Shipping time to uk
My build week was January 20th, and it's due in Germany on February 24th, then it'll be approximately a further 3 weeks to the Dealership, so I'd say it's about 7 weeks from build to Dealer.Sanpe11egino+ wrote: ↑Fri Feb 07, 2020 5:31 pm Hi my son ordered a polo gti+ back in November ,this week it was built ,can anyone give me a rough idea on how long it takes to arrive in the uk
Re: Shipping time to uk
Mine took exactly 8 weeks.
-
- Silver Member
- Posts: 307
- Joined: Tue May 29, 2018 1:06 pm
- Drives: 2018 Polo GTI +
- Location: Berkshire
Re: Shipping time to uk
Mine went something like this:
Polo GTI Plus ordered 7/02/2018
Limestone Grey + Blind Spot Detection + Rear Camera + Pre-Crash Protection. (Standard 17" Parker wheels)
Order number confirmed within 24hrs
Updated with the build week on 29/03/2018 Tracker changed to stage 3 of 7 build week confirmed.
Build Week Confirmed as Week 21, W/C 21/05
Ship Departed Port Elizabeth 01/06/18 Tracker changed to 5 of 7 In Transit.
Stopped at Vigo 18/06/18
Stopped at Zeebrugge 21/06/18
Arrived Emden 22/06/18
Sheerness 01/07/2018 A Month to the day from leaving Port Elizabeth...
06/07/2018 Tacker changed to stage 6 of 7 Arrived in UK
Arrived Dealership 10/07/2018
Delivery 13/07/2018
Polo GTI Plus ordered 7/02/2018
Limestone Grey + Blind Spot Detection + Rear Camera + Pre-Crash Protection. (Standard 17" Parker wheels)
Order number confirmed within 24hrs
Updated with the build week on 29/03/2018 Tracker changed to stage 3 of 7 build week confirmed.
Build Week Confirmed as Week 21, W/C 21/05
Ship Departed Port Elizabeth 01/06/18 Tracker changed to 5 of 7 In Transit.
Stopped at Vigo 18/06/18
Stopped at Zeebrugge 21/06/18
Arrived Emden 22/06/18
Sheerness 01/07/2018 A Month to the day from leaving Port Elizabeth...
06/07/2018 Tacker changed to stage 6 of 7 Arrived in UK
Arrived Dealership 10/07/2018
Delivery 13/07/2018